This came from an Excel file that was saved as HTML. It preserved the formatting better than when I converted to HTML from a Word doc. Need to apply Left(indent) alignment in Excel otherwise it uses Default alignment which the CMS for some reason interprets as centered alignment. It looks the best of any method I've tried but content editors can't edit it because they can only see the code. NEED TO MAKE THE COLUMN WIDTHS SMALLER SO IT DOESN'T GET CUT OFF.

FEE SCHEDULE - YEAR 2012
DIVISION OF ENVIRONMENTAL HEALTH
Effective 2/1/2012
AIR POLLUTION CONTROL PETROLEUM BULK STORAGE
Certificate to Operate (5 years) $ 415 Petroleum Bulk Storage Registration (3 Year)  
Permit to Construct $ 200 Capacity: 1,101-1,999 gallons $ 165
2,000-10,000 gallons $ 500
FOOD & RECREATION 10,000-399,999 gallons $ 800
Food Service Permit: 0-25 Seating Capacity $ 235 Review of Plans $ 300
26-50 Seating Capacity $ 320 Substantial Modification Plan Review $ 200
51-100 Seating Capacity $ 445 Tank Test License $ 300
101-200 Seating Capacity $ 625 Variance Application $ 200
>200 Seating Capacity $ 815 Late Fee $ 120
School Food Permit $ 445
Farm Market $ 120 SPECIAL SERVICES
Fee For Late Application $ 60 Tanning Parlor Permit (2 years) $ 30
Food Service Plan Review: New $ 150 Inspection fee per UV device $ 50
Alteration (Same Operator) $ 95 Separation of Non-Offensive Materials Plan
Review
$ 200
Mobile Food Service Establishment $ 200 Permit to Transport for Trucks =>26,000 lbs.  
Vending Machine $ 55 Garbage / Recycle / C&D Trucks $ 250
Temporary Food Service Establishment $ 55 Yard Waste / Scrap Metal Trucks $ 120
Day Care Center Inspection (DSS Licensing) $ 75 Permit to Transport for Trucks <26,000 lbs. $ 100
Children's Day Camp Permit $ 200 Late Fee $ 60
Bathing Facility Permit (per pool)  
Indoor Pool or Spa $ 230 TOBACCO & BODY ART
Outdoor Pool $ 230 Body Art Establishment Permit $ 250
Beach $ 230 Limited Body Art Establishment Permit $ 125
Bathing Facility Plan Review:   Body Art Practitioner Permit $ 120
New (includes 2 inspections) $ 300 Body Art Temporary Practitioner Permit $ 55
Additional Inspections $ 35 Limited Body Art Practitioner Permit $ 65
Renovations (per change) $ 65 Smoking Law Plan Review $ 200
HOUSING WATER POLLUTION
Mobile Home Park Permit: 1-15 Lots $ 190 Realty Subdivision Approval (per lot)  
16-50 Lots $ 280 (Does not include water or sewer main extension) $ 25
>50 Lots $ 470 Grease Trap Plan Review (not reviewed by
RCSD)
$ 120
Rooming House Permit: 1-15 Persons $ 190 Sewage Disposal System (Septic) Site Evaluation $ 120
16-50 Persons $ 280 Sewage Disposal System (Septic) Plan Review $ 180
>50 Persons $ 470 Sewage Disposal System (Septic) Inspection $ 300
Temporary Residence Permit (Motel/Hotel/Carnival/Circus) Private Disposal Plan Review (non-septic) $ 300
Capacity: 1-15 Rooms/Trailers/RV's $ 190 Sewer Main Plan Review $ 300
16-50 Rooms/Trailers/RV's $ 280
>50 Rooms/Trailers/RV's $ 470 WATER SUPPLY
Permit for Septic / Petroleum / Chemical Truck $ 300 Water Well Construction Permit $ 300
Housing Code Variance $ 415 Well Maintenance Permit $ 140
Late Fee $ 60 Resource Evaluation Well Permit (per site) $ 300
Geothermal Well Permit (per site) $ 300
MOSQUITO CONTROL Permit to Decommission a Well $ 300
Stormwater Plan Review: First Basin $ 300 Well Contractor Registration $ 35
Each Additional Basin $ 120 Private Water Sample:  
Catch Basin, Dry Well, etc $ 30 Bacteriological $ 45
Stormwater Basin Treatment $ 590 Lead & Copper $ 45
Permitted Pool Treatment:   Backflow Device Plan Review (each device) $ 120
First Pool (per treatment) $ 95 Water Main Plan Review $ 300
Each Additional Pool (per treatment) $ 65 Public Water Improvement: < $15,000 $ 95
Dormant Pool Treatment: First Pool $ 350 $15,000 - $100,000 $ 180
Each Additional Pool $ 235 > $100,000 $ 300
Private Pool Treatment $ 130
Late Fee $ 100
Please see our cancellations page for up to date information on meeting, event, class and exam cancellations and/or postponements.